Maersk’s Ireland export D&D tariffs will be revised for shipments with an origin price calculation date (PCD) on or after 1st July 2021. Please note that free time is in calendar days and charges thereafter are in EUR, applicable per container per calendar day.
Export Detention (all IE ports)
Equipment detention commences on and includes the day that the empty container is collected and ends on the day that the full container is gated-in at the first load port.
Dry containers
Days | 20’ DRY | 40’ / 40’hc | 45’ DRY |
---|---|---|---|
Days
1 to 7
|
20’ DRY
free
|
40’ / 40’hc
free
|
45’ DRY
free
|
Days
8 to 14
|
20’ DRY
15
|
40’ / 40’hc
24
|
45’ DRY
24
|
Days
15 onwards
|
20’ DRY
30
|
40’ / 40’hc
48
|
45’ DRY
48
|
Reef, Flat & Open top containers
Days | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF | 40’ REEF |
---|---|---|---|---|
Days
1 to 7
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF
free
|
40’ REEF
free
|
Days
8 to 14
|
20’ Flat & Open top
35
|
40’ Flat & Open top
56
|
20’ REEF
60
|
40’ REEF
96
|
Days
15 onwards
|
20’ Flat & Open top
50
|
40’ Flat & Open top
80
|
20’ REEF
75
|
40’ REEF
120
|
Non-operating reefer (NOR) will be charged as DRY equipment
Shippers’ own containers (SOC) will not be subject to equipment detention charges
The free time & charges applied will be those in place on the origin price calculation date (PCD)
Cancelled (frustrated) exports will be subject to detention charges without free time
Export Demurrage (all IE ports)
Demurrage (including equipment & storage) commences on and includes the day that the full container is gated-in at the first load port and ends on the planned arrival day of the vessel on which, at time of gate-in, the container is booked to load.
Dry containers
Days | 20’ DRY | 40’ / 40’hc | 45’ DRY |
---|---|---|---|
Days
1 to 6
|
20’ DRY
free
|
40’ / 40’hc
free
|
45’ DRY
free
|
Days
7 to 10
|
20’ DRY
free
|
40’ / 40’hc
free
|
45’ DRY
free
|
Days
11 to 14
|
20’ DRY
15
|
40’ / 40’hc
24
|
45’ DRY
24
|
Days
15 onwards
|
20’ DRY
45
|
40’ / 40’hc
72
|
45’ DRY
72
|
Reef, Flat & Open top containers
Days | 20’ Flat & Open top | 40’ Flat & Open top | 20’ REEF | 40’ REEF |
---|---|---|---|---|
Days
1 to 6
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF
free
|
40’ REEF
free
|
Days
7 to 10
|
20’ Flat & Open top
free
|
40’ Flat & Open top
free
|
20’ REEF
45
|
40’ REEF
45 |
Days
11 to 14
|
20’ Flat & Open top
35
|
40’ Flat & Open top
56 |
20’ REEF
60
|
40’ REEF
69 |
Days
15 onwards
|
20’ Flat & Open top
65
|
40’ Flat & Open top
104
|
20’ REEF
90
|
40’ REEF
117 |
Reefer demurrage includes plug-in/electricity charges
Shippers’ own containers (SOC) are subject to demurrage applicable to the equipment size/type
The free time & charges applied will be those in place on the origin price calculation date (PCD)
Cancelled (frustrated) exports will be subject to demurrage charges without free time
Full details of Maersk D&D tariffs are available online at the following links
We want to thank you for your business and look forward to continuously serving your global transportation needs.
无论您需要什么,我们都可以随时为您提供帮助
提交此表,即表示我同意通过电子邮件接收 A. P. 穆勒-马士基集团及其关联公司接收物流相关新闻和营销信息更新。我了解我可以随时通过点击退订链接,取消接收此类马士基推送信息。如需查看我们会如何处理您的个人信息,请查阅隐私公告。