Shipping to and from U.A.E.
Your complete guide to shipping to and from U.A.E. Find the right route, get Maersk office locations, discover local solutions, payment options and more.
出口
获得有关当地出口流程和限制、滞港和滞箱以及集装箱卸货等方面的最新信息。
Combined Demurrage and Detention
Combined demurrage and detention starts from gate-out empty day (included) from terminal, ends with shipped on board date (included).
Currency - AED
Free time
| TYPE | DRY | FLAT & OPEN TOP | REEFER | IMO |
|---|---|---|---|---|
|
TYPE
DAYS
|
DRY
10
|
FLAT & OPEN TOP
5
|
REEFER
5
|
IMO
5
|
Tariff after free time
| Days after freetime expiration | 20' DRY/NOR | 40'/45' DRY/HC/NOR |
|---|---|---|
|
Days after freetime expiration
Day 11– 14
|
20' DRY/NOR
85
|
40'/45' DRY/HC/NOR
170
|
|
Days after freetime expiration
Day 15 - 21
|
20' DRY/NOR
170
|
40'/45' DRY/HC/NOR
340
|
|
Days after freetime expiration
Day 22 Onwards
|
20' DRY/NOR
340
|
40'/45' DRY/HC/NOR
680
|
| Days after freetime expiration | 20' REEF | 40' REEF | 20'FLAT / OPEN TOP | 40'FLAT / OPEN TOP | 20'IMO / 40'IMO |
|---|---|---|---|---|---|
|
Days after freetime expiration
Day 6 - 10
|
20' REEF
250
|
40' REEF
500
|
20'FLAT / OPEN TOP
85
|
40'FLAT / OPEN TOP
170
|
20'IMO / 40'IMO
85 / 170
|
|
Days after freetime expiration
Day 11 – 15
|
20' REEF
500
|
40' REEF
1000
|
20'FLAT / OPEN TOP
170
|
40'FLAT / OPEN TOP
340
|
20'IMO / 40'IMO
170 / 340
|
|
Days after freetime expiration
Day 16 Onwards
|
20' REEF
1000
|
40' REEF
2000
|
20'FLAT / OPEN TOP
340
|
40'FLAT / OPEN TOP
680
|
20'IMO / 40'IMO
340 / 680
|
Storage
Mention triggers for calculation as per standard triggers
All U.A.E Ports excluding Sharjah , Fujairah
Free time
| TYPE | 20' ALL TYPES | 40' ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
TYPE
Days
|
20' ALL TYPES
10
|
40' ALL TYPES
10
|
20'OOG
10
|
40'OOG
10
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
Days after freetime expiration
Day 11 - 30
|
20' ALL TYPES
31
|
40' ALL TYPES
62
|
20'OOG
93
|
40'OOG
186
|
|
Days after freetime expiration
Day 31 - 60
|
20' ALL TYPES
41
|
40' ALL TYPES
82
|
20'OOG
123
|
40'OOG
246
|
|
Days after freetime expiration
Day 61 onwards
|
20' ALL TYPES
82
|
40' ALL TYPES
164
|
20'OOG
246
|
40'OOG
492
|
Fujairah PORT - Free time:
| TYPE | 20'ALL TYPES | 40'ALL TYPES |
|---|---|---|
|
TYPE
Days
|
20'ALL TYPES
1
|
40'ALL TYPES
1
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES |
|---|---|---|
|
Days after freetime expiration
Day 2 - 11
|
20' ALL TYPES
60
|
40' ALL TYPES
100
|
|
Days after freetime expiration
Day 12- 21
|
20' ALL TYPES
90
|
40' ALL TYPES
175
|
|
Days after freetime expiration
Day 22 onwards
|
20' ALL TYPES
175
|
40' ALL TYPES
350
|
Sharjah PORT - Free time:
| TYPE | 20'ALL TYPES | 40'ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
TYPE
Days
|
20'ALL TYPES
30
|
40'ALL TYPES
30
|
20'OOG
NIL
|
40'OOG
NIL
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES |
|---|---|---|
|
Days after freetime expiration
Day 31 - 60
|
20' ALL TYPES
75
|
40' ALL TYPES
150
|
|
Days after freetime expiration
Day 61 onwards
|
20' ALL TYPES
150
|
40' ALL TYPES
300
|
Tariff after free time
| Days afterfreetimeexpiration | 20'OOG | 40'OOG |
|---|---|---|
|
Days afterfreetimeexpiration
Day 1 - 10
|
20'OOG
60
|
40'OOG
120
|
|
Days afterfreetimeexpiration
Day 11 - 30
|
20'OOG
90
|
40'OOG
180
|
|
Days afterfreetimeexpiration
Day 31 - 60
|
20'OOG
160
|
40'OOG
320
|
|
Days afterfreetimeexpiration
Day 61 onwards
|
20'OOG
200
|
40'OOG
400
|
UAE ports Cut off Details - WK 38-39 2026
| Port | Vessel Name | Voyage | ETA | ETD | Booking Cut off | Load list / SI/ VGM Cut off | ED Document to be share with Maersk | Jebel Ali Gate in / Inspection |
|---|---|---|---|---|---|---|---|---|
| Khor Fakkan | MAERSK BALTIMORE | 637S | Tue 15 09:00 | Thu 17 21:00 | Wed 09 09:00 | Wed 09 14:00 | Thu 10 10:00 | Fri 11 17:00 |
| Khor Fakkan | GFS ROJA | 0012 | Mon 21 23:00 | Tue 22 09:00 | Mon 14 09:00 | Mon 14 14:00 | Tue 15 10:00 | Wed 16 23:00 |
| Khor Fakkan | MAERSK GAIRLOCH | 630S | Mon 21 09:12 | Wed 23 21:12 | Mon 14 09:00 | Mon 14 14:00 | Tue 15 10:00 | Wed 16 09:12 |
| Khor Fakkan | MAERSK SEBAROK | 638E | Sun 20 13:00 | Thu 24 02:00 | Fri 11 09:00 | Fri 11 14:00 | Mon 14 10:00 | Tue 15 13:00 |
| Khor Fakkan | MAERSK BALTIMORE | 639S | Sat 26 02:00 | Mon 28 14:00 | Fri 18 09:00 | Fri 18 14:00 | Fri 18 17:00 | Fri 18 17:00 |
| Khor Fakkan | MAERSK GAIRLOCH | 631S | Wed 30 18:12 | Sat 03 06:12 | Wed 23 09:00 | Wed 23 14:00 | Thu 24 10:00 | Fri 25 18:12 |
| Khor Fakkan | MAERSK NAMIBIA | 640S | Sun 04 12:00 | Tue 06 14:00 | Fri 25 09:00 | Fri 25 14:00 | Mon 28 10:00 | Tue 29 12:00 |
| Khor Fakkan | MAERSK BALTIMORE | 641S | Tue 06 02:00 | Thu 08 14:00 | Tue 29 09:00 | Tue 29 14:00 | Wed 30 10:00 | Wed 30 17:00 |
| Khor Fakkan | MAERSK GAIRLOCH | 632S | Sat 10 18:12 | Tue 13 06:12 | Fri 02 09:00 | Fri 02 14:00 | Fri 02 17:00 | Mon 05 18:12 |
Fujairah terminal Cut off Details - WK 38-39 2026
| Port | Vessel Name | Voyage | ETA | ETD | Booking Cut off | Load list / SI/ VGM Cut off | ED Document to be share with Maersk | Jebel Ali Gate in / Inspection |
|---|---|---|---|---|---|---|---|---|
| Fujairah Terminal | SUMMIT SINGAPORE | 606E | Thu 17 07:00 | Sat 19 07:00 | Thu 10 09:00 | Thu 10 14:00 | Fri 11 10:00 | Fri 11 17:00 |
| Fujairah Terminal | GFS PRIDE | 046N | Sat 19 04:00 | Sun 20 04:00 | Fri 11 09:00 | Fri 11 14:00 | Fri 11 17:00 | Fri 11 17:00 |
| Fujairah Terminal | GFS PRECIOUS | 051W | Sun 20 05:00 | Mon 21 05:00 | Fri 11 09:00 | Fri 11 14:00 | Mon 14 10:00 | Mon 14 17:00 |
| Fujairah Terminal | GFS GISELLE | 042E | Sun 20 22:00 | Mon 21 20:00 | Fri 11 09:00 | Fri 11 14:00 | Mon 14 10:00 | Tue 15 22:00 |
| Fujairah Terminal | MDV AEFJR DUMMY 1 | 001W | Mon 21 12:00 | Wed 23 02:00 | Mon 14 09:00 | Mon 14 14:00 | Tue 15 10:00 | Wed 16 12:00 |
| Fujairah Terminal | SAFEEN POWER | 636S | Wed 23 21:00 | Sat 26 04:00 | Wed 16 09:00 | Wed 16 14:00 | Thu 17 10:00 | Fri 18 21:00 |
| Fujairah Terminal | GFS ROJA | 0012 | Wed 23 11:00 | Sat 26 11:00 | Wed 16 09:00 | Wed 16 14:00 | Thu 17 10:00 | Fri 18 11:00 |
| Fujairah Terminal | GFS PRIME | O01E | Fri 25 04:00 | Sat 26 15:00 | Fri 18 09:00 | Fri 18 14:00 | Fri 18 17:00 | Fri 18 17:00 |
| Fujairah Terminal | GSL ROSSI | 638S | Thu 24 22:00 | Sun 27 05:00 | Thu 17 09:00 | Thu 17 14:00 | Fri 18 10:00 | Fri 18 17:00 |
| Fujairah Terminal | GFS GENESIS | 016E | Fri 25 18:00 | Sun 27 18:00 | Fri 18 09:00 | Fri 18 14:00 | Fri 18 17:00 | Fri 18 17:00 |
| Fujairah Terminal | GSL MELINA | 640S | Mon 28 01:00 | Wed 30 03:00 | Mon 21 09:00 | Mon 21 14:00 | Tue 22 10:00 | Tue 22 17:00 |
| Fujairah Terminal | GFS PRIDE | 047N | Wed 30 23:00 | Sat 03 23:00 | Wed 23 09:00 | Wed 23 14:00 | Thu 24 10:00 | Fri 25 23:00 |
| Fujairah Terminal | MDV AEFJR DUMMY 1 | 641E | Wed 07 02:00 | Thu 08 16:00 | Wed 30 09:00 | Wed 30 14:00 | Thu 01 10:00 | Thu 01 17:00 |
| Fujairah Terminal | GSL ROSSI | 640S | Tue 06 22:00 | Fri 09 05:00 | Tue 29 09:00 | Tue 29 14:00 | Wed 30 10:00 | Thu 01 22:00 |
| Fujairah Terminal | GFS GISELLE | 043E | Thu 08 17:00 | Fri 09 13:00 | Thu 01 09:00 | Thu 01 14:00 | Fri 02 10:00 | Fri 02 17:00 |
| Fujairah Terminal | GFS PRIME | O02E | Thu 08 16:00 | Sat 10 03:00 | Thu 01 09:00 | Thu 01 14:00 | Fri 02 10:00 | Fri 02 17:00 |
| Fujairah Terminal | GFS ROJA | 0013 | Thu 08 11:00 | Sun 11 11:00 | Thu 01 09:00 | Thu 01 14:00 | Fri 02 10:00 | Fri 02 17:00 |
| Fujairah Terminal | SAFEEN POWER | 638S | Sun 11 15:10 | Tue 13 22:10 | Fri 02 09:00 | Fri 02 14:00 | Mon 05 10:00 | Tue 06 15:10 |
| Fujairah Terminal | GFS PRIDE | 049N | Mon 12 11:00 | Thu 15 11:00 | Mon 05 09:00 | Mon 05 14:00 | Tue 06 10:00 | Wed 07 11:00 |
If the actual commodity is Steel Coil or Metal Material Article with weight of per unit more than 2 tons then you must have to follow a Process of standard stuffing to avoid cargo shift during transport.
If single Commodity weight is more than 2 ton or Commodities in bundles or multiple commodities put on pallet then Single pallet weight is more than 2 ton, we require stuffing images in word file format for each container separately.
If your actual Commodity is METAL COIL / Similar = Please refer attached TT Club guidelines + COIL REQUEST TEMPLATE version 1.16
If your actual Commodity is Metal Plates / Similar = Please refer attached Plates A REQUEST TEMPLATE version 1.4
If your actual Commodity is Metal Pipes/Rod / Similar = PIPE D Heavy Bars REQUEST TEMPLATE version 1.3
Please do not gate-in Containers until Stuffing wise acceptance is received from our side.
Important note: Unless the pictures of stuffing and securing are sent and stuffing acceptance confirmation received from our end, kindly do not seal the box or move them to gate in. Improper lashing / securing can be unseaworthy and pose threat to life and can damage crane/vehicle/cargo/container and/or vessel.
Export:
Export Class 5 IMDG Containers shall be shipped from Port within 3 Days.
Transshipment:
Transshipment Class 5 IMDG Containers shall not be stored in Port more than 7 Days.