Shipping to and from U.A.E.
Your complete guide to shipping to and from U.A.E. Find the right route, get Maersk office locations, discover local solutions, payment options and more.
出口
获得有关当地出口流程和限制、滞港和滞箱以及集装箱卸货等方面的最新信息。
Combined Demurrage and Detention
Combined demurrage and detention starts from gate-out empty day (included) from terminal, ends with shipped on board date (included).
Currency - AED
Free time
| TYPE | DRY | FLAT & OPEN TOP | REEFER | IMO |
|---|---|---|---|---|
|
TYPE
DAYS
|
DRY
10
|
FLAT & OPEN TOP
5
|
REEFER
5
|
IMO
5
|
Tariff after free time
| Days after freetime expiration | 20' DRY/NOR | 40'/45' DRY/HC/NOR |
|---|---|---|
|
Days after freetime expiration
Day 11– 14
|
20' DRY/NOR
85
|
40'/45' DRY/HC/NOR
170
|
|
Days after freetime expiration
Day 15 - 21
|
20' DRY/NOR
170
|
40'/45' DRY/HC/NOR
340
|
|
Days after freetime expiration
Day 22 Onwards
|
20' DRY/NOR
340
|
40'/45' DRY/HC/NOR
680
|
| Days after freetime expiration | 20' REEF | 40' REEF | 20'FLAT / OPEN TOP | 40'FLAT / OPEN TOP | 20'IMO / 40'IMO |
|---|---|---|---|---|---|
|
Days after freetime expiration
Day 6 - 10
|
20' REEF
250
|
40' REEF
500
|
20'FLAT / OPEN TOP
85
|
40'FLAT / OPEN TOP
170
|
20'IMO / 40'IMO
85 / 170
|
|
Days after freetime expiration
Day 11 – 15
|
20' REEF
500
|
40' REEF
1000
|
20'FLAT / OPEN TOP
170
|
40'FLAT / OPEN TOP
340
|
20'IMO / 40'IMO
170 / 340
|
|
Days after freetime expiration
Day 16 Onwards
|
20' REEF
1000
|
40' REEF
2000
|
20'FLAT / OPEN TOP
340
|
40'FLAT / OPEN TOP
680
|
20'IMO / 40'IMO
340 / 680
|
Storage
Mention triggers for calculation as per standard triggers
All U.A.E. Ports excluding sharjah
Free time
| TYPE | 20' ALL TYPES | 40' ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
TYPE
Days
|
20' ALL TYPES
10
|
40' ALL TYPES
10
|
20'OOG
10
|
40'OOG
10
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
Days after freetime expiration
Day 11 - 30
|
20' ALL TYPES
31
|
40' ALL TYPES
62
|
20'OOG
93
|
40'OOG
186
|
|
Days after freetime expiration
Day 31 - 60
|
20' ALL TYPES
41
|
40' ALL TYPES
82
|
20'OOG
123
|
40'OOG
246
|
|
Days after freetime expiration
Day 61 onwards
|
20' ALL TYPES
82
|
40' ALL TYPES
164
|
20'OOG
246
|
40'OOG
492
|
Sharjah PORT - Free time:
| TYPE | 20'ALL TYPES | 40'ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
TYPE
Days
|
20'ALL TYPES
30
|
40'ALL TYPES
30
|
20'OOG
NIL
|
40'OOG
NIL
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES |
|---|---|---|
|
Days after freetime expiration
Day 31 - 60
|
20' ALL TYPES
75
|
40' ALL TYPES
150
|
|
Days after freetime expiration
Day 61 onwards
|
20' ALL TYPES
150
|
40' ALL TYPES
300
|
Tariff after free time
| Days afterfreetimeexpiration | 20'OOG | 40'OOG |
|---|---|---|
|
Days afterfreetimeexpiration
Day 1 - 10
|
20'OOG
60
|
40'OOG
120
|
|
Days afterfreetimeexpiration
Day 11 - 30
|
20'OOG
90
|
40'OOG
180
|
|
Days afterfreetimeexpiration
Day 31 - 60
|
20'OOG
160
|
40'OOG
320
|
|
Days afterfreetimeexpiration
Day 61 onwards
|
20'OOG
200
|
40'OOG
400
|
Cut off Details - WK 18-19 2026
| Port | Vessel Name / Voyage | ETA / ETD | Booking Cut off (Flyer & Blank DCC) / Load list / SI Cut off | 3rd Party SOC loading file updation deadline | VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade |
|---|---|---|---|---|---|
|
Port
Ajman Port
|
Vessel Name / Voyage
DUBAI VENTURE / 341W
|
ETA / ETD
Tue 28 13:00 / Wed 29 02:00
|
Booking Cut off (Flyer & Blank DCC) / Load list / SI Cut off
Fri 24 11:00 / Fri 24 17:00
|
3rd Party SOC loading file updation deadline
Sun 26 11:00
|
VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade
Tue 28 01:00
|
|
Port
Jebel Ali T2
|
Vessel Name / Voyage
W KITHIRA / 613E
|
ETA / ETD
Mon 27 19:00 / Wed 29 16:00
|
Booking Cut off (Flyer & Blank DCC) / Load list / SI Cut off
Fri 24 11:00 / Fri 24 17:00
|
3rd Party SOC loading file updation deadline
Sat 25 20:00
|
VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade
Mon 27 07:00
|
|
Port
Khor Fakkan
|
Vessel Name / Voyage
ELENI T / 618S
|
ETA / ETD
Thu 30 04:00 / Fri 01 16:00
|
Booking Cut off (Flyer & Blank DCC) / Load list / SI Cut off
Mon 27 11:00 / Mon 27 17:00
|
3rd Party SOC loading file updation deadline
Mon 27 12:00
|
VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade
Wed 29 16:00
|
|
Port
Khor Fakkan
|
Vessel Name / Voyage
MAERSK KENTUCKY / 619S
|
ETA / ETD
Fri 01 14:00 / Sat 02 10:00
|
Booking Cut off (Flyer & Blank DCC) / Load list / SI Cut off
Wed 29 14:00 / Thu 30 11:00
|
3rd Party SOC loading file updation deadline
Wed 29 14:00
|
VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade
Fri 01 02:00
|
|
Port
Jebel Ali T2
|
Vessel Name / Voyage
MAERSK YORKTOWN / 618W
|
ETA / ETD
Sat 02 18:00 / Sun 03 12:00
|
Booking Cut off (Flyer & Blank DCC) / Load list / SI Cut off
Mon 27 11:00 / Mon 27 17:00
|
3rd Party SOC loading file updation deadline
Mon 27 09:00
|
VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade
Sat 02 06:00
|
|
Port
Jebel Ali T2
|
Vessel Name / Voyage
DUBAI VENTURE / 343G
|
ETA / ETD
Mon 04 00:00 / Tue 05 12:01
|
Booking Cut off (Flyer & Blank DCC) / Load list / SI Cut off
Fri 01 11:00 / Fri 01 17:00
|
3rd Party SOC loading file updation deadline
Fri 01 00:00
|
VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade
Sun 03 12:00
|
|
Port
Jebel Ali T2
|
Vessel Name / Voyage
AS CLEMENTINA / 413W
|
ETA / ETD
Mon 04 18:47 / Wed 06 03:47
|
Booking Cut off (Flyer & Blank DCC) / Load list / SI Cut off
Fri 01 11:00 / Fri 01 17:00
|
3rd Party SOC loading file updation deadline
Fri 01 21:45
|
VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade
Mon 04 06:47
|
|
Port
Ras Al Khaimah
|
Vessel Name / Voyage
DUBAI VENTURE / 343G
|
ETA / ETD
Wed 06 13:00 / Thu 07 03:00
|
Booking Cut off (Flyer & Blank DCC) / Load list / SI Cut off
Mon 04 11:00 / Mon 04 17:00
|
3rd Party SOC loading file updation deadline
Mon 04 03:00
|
VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade
Wed 06 01:00
|
If the actual commodity is Steel Coil or Metal Material Article with weight of per unit more than 2 tons then you must have to follow a Process of standard stuffing to avoid cargo shift during transport.
If single Commodity weight is more than 2 ton or Commodities in bundles or multiple commodities put on pallet then Single pallet weight is more than 2 ton, we require stuffing images in word file format for each container separately.
If your actual Commodity is METAL COIL / Similar = Please refer attached TT Club guidelines + COIL REQUEST TEMPLATE version 1.16
If your actual Commodity is Metal Plates / Similar = Please refer attached Plates A REQUEST TEMPLATE version 1.4
If your actual Commodity is Metal Pipes/Rod / Similar = PIPE D Heavy Bars REQUEST TEMPLATE version 1.3
Please do not gate-in Containers until Stuffing wise acceptance is received from our side.
Important note: Unless the pictures of stuffing and securing are sent and stuffing acceptance confirmation received from our end, kindly do not seal the box or move them to gate in. Improper lashing / securing can be unseaworthy and pose threat to life and can damage crane/vehicle/cargo/container and/or vessel.
Export:
Export Class 5 IMDG Containers shall be shipped from Port within 3 Days.
Transshipment:
Transshipment Class 5 IMDG Containers shall not be stored in Port more than 7 Days.