How we reduced logistics costs by 26% for one of the world’s leading fast-fashion companies.


The customer

The customer is one of the top fast fashion companies globally. Initially founded as a textile manufacturer, they are now a global brand with over 1000 stores around the world.

The challenge

Our customer was battling with high intangible logistics costs along with concerns over 77% of cargo arriving at destination 10 days earlier than required. This was leading to overflow and capacity issues, as well as increased detention & demurrage – and the costs that come with it. They wanted to address these issues without compromising their supply chain efficiency while still maintaining a high delivery in full, on time.

As a logistics partner, we had to devise an inventory flow control system to transport cargo with greater flexibility as per the market demands. This meant, we needed to utilise multiple shipping methods that would eventually contribute to business growth.

The Maersk solution

A huge part of the challenge was a result of the customer’s ‘push’ driven model that hindered their ability to maximise transport efficiency and effectiveness. Instead, we proposed a ‘model where the expected delivery date would dictate the shipping method to move cargo.

We designed a 6-speed supply chain methodology which proposes how cargo should be moved using multiple speeds from origin to destination. Cargo will be shipped based on the required delivery dates using the most cost-efficient speed to market solution.

This not only lead to better container capacity utilisation but would also reduce the customer’s demurrage and detention charges, resulting in a more efficient, steady, and end-to-end flow of cargo.

The result

The strategy of using multiple shipping methods proved immensely successful and garnered the following results.

logistics price
26% logistics spend reduction on China-European Trade
Container utilisation
8% increase in container utilisation
Container count reduction
4% container count reduction
Stopwatch
99.99% delivered in full on time effect

Along with this, we were also able to free up logistics costs to allow up to 36% of the total cargo volume to move via rail, if needed, reducing the weighted lead time by 40%.

无论您需要什么,我们都可以随时为您提供帮助

解决方案

解决方案

我们满足从供应链一端到另一端的客户需求。
联系我们

联系我们

我们的专家团队随时为您服务。
查询价格

准备好运送货物?

查询航运及内陆运输费率。
关注最新动态
注册订阅马士基新闻与洞察
收取直接发送至您收件箱的有关供应链趋势的宝贵信息,在业内保持一路领先

I agree to receive logistics related news and marketing updates by email, phone, messaging services (e.g. WhatsApp) and other digital platforms, including but not limited to social media (e.g., LinkedIn) from A. P. Moller-Maersk and its affiliated companies (see latest company overview). I understand that I can opt out of such Maersk communications at any time by clicking the unsubscribe link. To see how we use your personal data, please read our Privacy Notification.

By completing this form, you confirm that you agree to the use of your personal data by Maersk as described in our Privacy Notification.

感谢您注册
您现在已经注册接收新闻通讯。您很快将收到一封电子邮件,其中将说明如何对该新闻通讯进行偏好设置。
已订阅
您可以随时取消订阅。