Inland Transport in Brazil
Integrated truck, rail and barge solutions connecting Brazil’s major ports and inland hubs, supporting smooth cargo flows across the country.
Extensive inland coverage across Brazil
Brazil’s busiest corridors move fast — and so can your cargo. Maersk's inland transport services connect production hubs to major ports like Santos, Pecém and Itapoá. Seamlessly shift between trucking, rail, barge, and cabotage to bypass delays, speed up delivery, and keep cargo flowing.
With our real-time visibility tools, you'll gain faster lead times, avoid bottlenecks and stay in control. Use these insights and resources to strengthen your inland strategy and unlock Brazil’s full supply chain potential.
Why Maersk Inland Transport in Brazil?
Brazil port network
Port locations
| Port/ Gateway Name | Port/Gateway Address |
|---|---|
|
Port/ Gateway Name
Rio Grande
|
Port/Gateway Address
TECON Rio Grande / Address: Avenida Almirante Maximiano da Fonseca, 201 - 4ª Seção da Barra, Rio Grande - RS, 96204-040, Brazil
|
|
Port/ Gateway Name
Itajai
|
Port/Gateway Address
APMT / Address: Av. Cel. Eugênio Muller, 300 - Centro, Itajaí - SC, 88301-120 - Brazil
|
|
Port/ Gateway Name
Itapoa
|
Port/Gateway Address
Porto de Itapoa / Address: Av. Beira Mar 5, 2900, Itapoá - SC, 89249-000 - Brazil
|
|
Port/ Gateway Name
Paranagua
|
Port/Gateway Address
TCP / Address: Av. Portuaria, s/n - Dom Pedro II, Paranaguá - PR, 83203-800 - Brazil
|
|
Port/ Gateway Name
Santos (BTP terminal)
|
Port/Gateway Address
BTP / Address: Av. Eng. Augusto Barata, s/n - Alemoa, Santos - SP, 11095-907 - Brazil
|
|
Port/ Gateway Name
Santos (Santos Brasil Terminal)
|
Port/Gateway Address
Santos Brasil/Address: Rod. Cônego Domênico Rangoni, 3105 - Vila Aurea (Vicente de Carvalho), Guarujá - SP, 11454-700 - Brazil
|
|
Port/ Gateway Name
Santos (DPW terminal)
|
Port/Gateway Address
DPW / Address: Estr. Particular da Codesp - Ilha Barnabé, Santos - SP - Brazil
|
|
Port/ Gateway Name
Itaguai
|
Port/Gateway Address
Porto Itaguai / Address: Estrada Humberto Pedro Francisco - Ilha da Madeira, Itaguaí - RJ, 23826-590 - Brazil
|
|
Port/ Gateway Name
Salvador
|
Port/Gateway Address
Tecon Salvador / Address: Av. Engenheiro Oscar Pontes 97 Salvador - BA 40411-220- Brazil
|
|
Port/ Gateway Name
Pecem
|
Port/Gateway Address
Porto do Pecem / Address: Esplanada do Pecém, s/n - Distrito do Pecém, São Gonçalo do Amarante - CE, 62674-000- Brazil
|
|
Port/ Gateway Name
Suape
|
Port/Gateway Address
Porto de Suape / Address: Km 10, Rodovia PE-60, s/n - Cabo de Santo Agostinho, Ipojuca - PE, 55590-972- Brazil
|
|
Port/ Gateway Name
Manaus
|
Port/Gateway Address
Porto Chibatao / Address: R Zebu, 201 | Manaus - AM, CEP: 69070-140 - Brazil
|
|
Port/ Gateway Name
Rio de Janeiro
|
Port/Gateway Address
MultiRio / Address: Av. Rio de Janeiro, 4031 - Caju, Rio de Janeiro - RJ, 20931-675 - Brazil
|
|
Port/ Gateway Name
|
Port/Gateway Address
Libra Terminal/ Address: Av. Rio de Janeiro, s/n - Ponta do Caju, Rio de Janeiro - RJ, 20931-670 - Brazil
|
|
Port/ Gateway Name
Navegantes
|
Port/Gateway Address
Portonave - Av. Portuária Vicente Honorato Coelho, 1 - São Domingos, Navegantes - SC, 88370-904, Brasil
|
Brazil depot locations
Depot locations
| Depot Name | Barge | Rail | Truck |
|---|---|---|---|
|
Depot Name
Santos - S Magalhaes
|
Barge
No
|
Rail
No
|
Truck
Yes
|
|
Depot Name
Santos - Brado
|
Barge
No
|
Rail
No
|
Truck
Yes
|
|
Depot Name
Cambe - Brado
|
Barge
No
|
Rail
Yes
|
Truck
Yes
|
|
Depot Name
Rondonopolis - Brado
|
Barge
No
|
Rail
Yes
|
Truck
Yes
|
Brazil inland hubs
Hub locations
| Inland Hub Name | Inland hub Address | Barge | Rail | Truck |
|---|---|---|---|---|
|
Inland Hub Name
Rondonópolis
|
Inland hub Address
BRADO / Address: BR-163, 95 - Vila Salmem, Rondonópolis - MT, 78700-970 - Brazil
|
Barge
No
|
Rail
Yes
|
Truck
Yes
|
|
Inland Hub Name
Cambé
|
Inland hub Address
BRADO / Address: 2550 - Av. José Bonifácio - Vila Atalaia, Cambé - PR, 86181-570
|
Barge
No
|
Rail
Yes
|
Truck
Yes
|
|
Inland Hub Name
Cascavel
|
Inland hub Address
BRADO / Address: BR-277, 574, Cascavel - PR
|
Barge
No
|
Rail
Yes
|
Truck
Yes
|
|
Inland Hub Name
Jundiaí
|
Inland hub Address
MRS / Address: Vila Nambi, Jundiaí - SP, 13214-205
|
Barge
No
|
Rail
Yes
|
Truck
Yes
|
|
Inland Hub Name
Sao Jose dos Campos
|
Inland hub Address
MRS / Address: Av. Eng. Sebastião Gualberto, 203 - Vila Maria, São José dos Campos - SP, 12209-320
|
Barge
No
|
Rail
Yes
|
Truck
Yes
|
|
Inland Hub Name
Triunfo
|
Inland hub Address
Terminal Santa Clara - Polo Petroquímico - BR 386 - Rodovia Tabaí-Canoas - Km 419, 95840-000,, Triunfo - RS, 95840-000, Brasil
|
Barge
Yes
|
Rail
No
|
Truck
Yes
|
Brazil charges and fees
- PIS / COFINS (Brazilian Tax) is included in the tariff.
- 25% Import tax (Marinha Mercante) imposed if inland leg is included on the Bill of Lading.
- Rates include pick-up and drop-off of empty/full equipment, hauling of full containers to/from port terminal, GRIS (risk management), and Ad Valorem (insurance) for cargo valued up to BRL 500,000.
- For cargo valued between BRL 500,000.00 and BRL 1,000,000.00, there is an additional charge of BRL 250.00. For higher values, please request a special quotation.
- Please note that stuffing, stripping, and lashing services are not included.
- For containers with hazardous materials (IMO), there is an additional charge of BRL 300.00 per container, subject to prior approval.
- The free time for loading and unloading is up to 5 hours. After that, there will be an additional fee of BRL 135 per hour (except for Manaus).
- For operations in Manaus, the free time for loading and unloading unattached chassis is up to 24 hours. After that, there will be an additional charge of BRL 250 per day.
- Electronics goods require prior consultation and are allowed based on the value of the cargo.
- Additional cost per container for DTA/DAT process, as necessary. USD 80,00.
- Dead freight is 100% of the freight. Applicable to cancellations made by the client with notice of 24 hours or less. If the operation has already started, toll charges will also be passed through.
Proposal validity: Quotation valid upon acceptance, according to the validity stated above.
If there are changes in the profile or scope of the operation that affect the assumptions of the proposal, prices must be revised to maintain financial balance.
All new operations will be subject to an implementation process, including mapping of the operational flow and SOP agreed between the parties.
Freight adjustment: Will be based on the INCT-L index on the contract anniversary. The parties may also agree on new prices and adjustment methods if a contractual imbalance between the agreed prices and the actual service provided is evidenced, always aiming to maintain the economic and financial balance of the relationship. This cost analysis will be carried out quarterly, starting from the beginning of the agreement/contract. Any price adjustment will be previously communicated to the client and agreed between the parties.
Diesel trigger: Rates may be adjusted in case of variation, positive or negative, equal to or greater than 5% in the diesel price, according to the index published by the National Petroleum Agency (ANP), with the adjustment applied to 30% of the freight (weight component). This adjustment may occur at any time during the contract term or upon its expiration.
Toll pass-through: Rates are subject to automatic pass-through of toll adjustments, if applicable.
Payment terms: Payment term to be agreed, subject to credit approval.
Escort services: Escort costs must be requested separately from this proposal. All costs related to this scope will be fully passed on to the client.
Other carriers’ scheduling: Maersk is not responsible for the unavailability of containers or depot slots and will promptly notify the client so that the matter can be handled directly with the responsible carrier. Empty container return will be carried out within up to 24 hours after unloading. If no depot slot is available, the empty container will be directed to a partner terminal until return is possible. Any additional costs will be fully passed on. If the operation is not initiated within 24 hours after scheduling, Maersk reserves the right to remove its vehicles from the loading site, and all related costs will be fully charged to the client.
Maersk is not responsible for loss of opportunity, loss of profits, or any indirect damages;
Responsibility for any reimbursements related to incidents, losses, or damages will be assessed by Maersk’s claims department, excluding cases of force majeure;
Any costs that may arise and were not previously communicated for the preparation of this commercial proposal will be fully passed on.
Submit an enquiry below and our regional sales team will get in touch with you.
感谢您与我们联系!
您的请求已成功提交。我们的专家将审核您的请求,并尽快答复。感谢您的关注,我们期待着协助您达成物流需求。
准备好订舱了?
注册以进行在线订舱、管理和支付订单费用,并获取一系列旨在简化供应链的产品和服务。
Access your local office for detailed shipping information and local support.